Outdoor Pool

Outdoor Pool Community Input

 

Jamestown Parks and Recreation District is excited to begin planning for the future of our community’s outdoor pool and invites residents to be part of the conversation. Following the April 29 Open House, this page will serve as a central hub for project information, including concepts shared during the meeting, planning details, and opportunities for continued community input.

What Was Shared at the Open House:

 

Top Priorities for Investment

As part of the Comprehensive Plan, a Priority Investment Rating was created using community feedback to identify where residents felt recreation and park investments should be prioritized within JPRD.(Ranked 0 – 200 with 200 being the highest score possible.)

Graphic that shows a priority investment rating chart that shows where residents felt recreation and park investments should be prioritized.

Progress:

 

High Priority Items:

  • Outdoor pool feasibility study
  • ADA improvements to restrooms
  • Supporting community advocate groups for walking, hiking, and biking trails

 

Medium Priority Items:

  • Leapaldt Park – Removed dangerous out-of-date equipment, replaced with accessible play equipment and fall surfacing.
  • Nickeus Park – Complete Park renovation to include accessible parking, restrooms, shelters, and play equipment and surfacing.
  • Master plan created for Liechty and McElroy Parks
  • New picnic tables added to parks
  • New playground equipment being added toMcElroy Park summer of 2026
  • Literacy Lane installed in Solien-Denault and Meidinger Parks
  • Remodeled hospitality room at Hillcrest Golf Course
  • New lighting installed at JBS and Trapper Field
  • Indoor playground feasibility study

 

Low Priority Items:

  • Added outdoor volleyball courts to TRAC Campus
  • Upgrades to Disc Golf basket tops and chain sets in Klaus Park
  • Skate park committee created
  • Outdoor pickleball courts added to TRAC campus
  • Outdoor tennis courts resurfaced

TRAC Timeline

 

The timeline below highlights the journey of the TRAC project—from the formation of the planning committee and early community discussions to completed milestones and future phases still ahead. This visual reflects the work, collaboration, and long-term vision that have shaped TRAC into what it is today, while also showing the exciting improvements still to come. It’s a look at where we started, how far we’ve come, and where we’re headed next.

Timeline of the TRAC build as well as completed and future Phase 2 projects

Phased Projects

 

Phased development allows JPRD to turn long-term visions into achievable progress. Projects like TRAC and McElroy Park Field Renovations are designed in stages so improvements can be completed responsibly, with each phase building toward the full project goal.

 

TRAC Phase II

  • Outdoor Water/Bath House – Bath house and splash pad (constructed in 2020).   Space planned for expansion of bath house and pool.
  •   Third Court Addition to Gymnasium
  •   Indoor Playground
  •   Multi Purpose Courts
  •   Climbing Wall

 

McElroy Park Field Renovations Phases

  • Phase I – Two feature fields with artificial turf infields, restroom/concession building, parking lot and pathways. (Complete 2025)
  •   Phase II – Batting Cages (construction summer 2026), two cal ripken/fastpitch softball fields, two tee ball fields
  •   Phase III- Jack Brown Stadium- Concessions, restrooms, locker rooms, grandstand seating, field improvements

 

   Green Italic – Future Projects

2016 TRAC Expansion Site Plan

Site map of the TRAC Campus showing where an outdoor pool would go.

Possible Amenities/Features

OPEN WATER

Image of a deep water pool

WATER SLIDES

Picture of two water slides in an outdoor pool

SHADE/CABANA AREAS

Pool with shade structures over chairs

NINJA COURSE

Child playing on an over the water ninja course

ZIP LINE

Child on a zip line over a pool

LAZY RIVER

image of a lazy river

ZERO ENTRY

child sitting on the edge of a zero entry pool

DIVING BOARDS

Kids jumping off diving boards

CLIMBING WALL

ROPE/LILY PAD COURSE

Kids on a lily pad course in a pool

Capital Improvement Plan

As part of the Capital Improvement Plan an Outdoor Pool is a Tier 1 Priority. An outdoor aquatic facility has consistently ranked as one of the highest recreation priorities identified by Jamestown residents through the Parks and Recreation Comprehensive Plan and Capital Improvement Planning process.

 

To better understand what the community wanted to see, Jamestown Parks and Recreation gathered input through a public open house, an online survey, and additional outreach with preschool families and TRAC swim lesson participants. Nearly 90% of participants agreed the planning effort was moving in the right direction, with many expressing excitement about creating a modern outdoor aquatic destination for Jamestown.

 

Estimated cost: $12,922,000

Concept

The most requested features included:

  • Lifestyle/open water pool
  • Lazy river
  • Shade and cabana areas
  • Zero-depth entry
  • Diving boards

 

Phase II would include the water slides and possible ninja course

 

These are conceptual drawings and plans.  JPRD will meet with user groups before a design is finalized.

As the project moves forward, Jamestown Parks and Recreation will continue working with residents, swimming lesson instructors, families, accessibility advocates, and other stakeholders to refine the layout, amenities, and operational needs of the facility.

 

This collaborative approach ensures the final design reflects both community priorities and long-term financial sustainability while creating an outdoor aquatic destination that can serve Jamestown for generations.